Skyrise by Binghatti is a luxury development in Dubai's vibrant Business Bay, featuring three stunning towers near top attractions like The Dubai Mall, Burj Khalifa, and Dubai Opera. Perfect for those seeking sophistication, Skyrise offers an elevated lifestyle loaded with amenities, including an Olympic-sized pool, a private golf course, and everything you need integrated within the complex.
Building Configuration:
4 Basements + Ground + 5 Podiums + 48 Residential Floors + 2 Mechanical Rooms + Roof
Comprising three towers
Luxurious Interiors: Each unit is finished with high-end materials like fluted travertine, Calacatta Greek marble, and porcelain tiles. Natural wood and champagne metal details add warmth and sophistication.
Amenities:
Fully equipped fitness center
Indoor gym with aerobics area, sauna, and steam room for relaxation
Olympic-sized pool and several smaller pool areas on the deck
Crystal Lagoon (man-made beach)
Private golf course with integrated lake
Running Track
Padel, Tennis, and Basketball court
Chillout area and Outdoor lounge
Kids area
Spa facilities, incl. treatment rooms and relaxation lounges
Prime Location - proximities:
Dubai Downtown and Burj Khalifa: 5 min.
The Dubai Mall: 5 min.
Dubai Opera: 5 min
Dubai Design District: 7 min.
Dubai Financial Centre: 7 min.
Coca-Cola Arena: 9 min.
Dubai City Walk: 15 min.
Transportation
Nearest Current Metro Station Business Bay: Located on the Red Line, this station provides direct access to key areas such as Downtown Dubai, Dubai Marina, and Dubai International Airport.
A Blue Line Metro station is being planned in the property's neighborhood.
RTA Bus Stop: Bus number 26, F14, F19B are conveniently located directly at the tower
Water Taxis Stations: Business Bay features water taxi stations at Dubai Design District, Al Marasi Station, and Al Wajeha Al Maeyah Station, offering scenic routes along the Dubai Water Canal.
Airport Access:
25 min. from Dubai International Airport and 35 min. from Al Maktoum International Airport
Payment plan: 70/30
Down Payment: 20%
The final installment (30%) is due at 100% completion, estimated at the end of 2026.
Loading...
Features / Amenities
The information is given according to data from the developer