Construction began in November 2006. The estimated handover date was December 2018. The project was completed in October 2018.
Dubai International Airport (DXB) is roughly 27 minutes' drive and the new Al Maktoum International Airport is roughly 31 minutes' drive. *
This Tower, JLT is a well-maintained building. Each and every unit within the building has central air-conditioning, ensuring that residents enjoy their living spaces in absolute comfort during the summer heatwaves. 24/7 security system is also there to ensure the safety of the residents.
Preatoni Tower, JLT Cluster L has a large swimming pool that means you do not need to go far from the comfort of your home for swimming. There are also a sauna and jacuzzi rooms. To entertain the kids in the community, as there is a large outdoor, fenced kids play area with padded floors. There are slides, a treehouse and a few swings. Despite an outdoor space, it is well-protected from the sunlight.
Loading...
Features / Amenities
The information is given according to data from the developer
Reception / Lobby Area
Gymnasium
Swimming Pool
Jacuzzi
Sauna
Kids Play Area
Dubai
Preatoni Tower, JLT Cluster L, Jumeirah Lake Towers (JLT), Dubai